How long does it take to build a cleanroom to build?
The building of a cleanroom usually takes between three to six months, less salient details and unexpected factors, such as locations and types of utilities lead to some delays. At Highcare cleanrooms we know how important a fast, reliable planning is. That’s why we work closely with you from day one to carefully plan every step and technical requirement so that your cleanroom constructionprocess runs smoothly and without surprises.
Cleanroom planning For fast and efficient delivery
The install of a your cleanroom begins with careful planning and good cooperation. From the very first moment, we work closely with your team to clearly identify all technical requirements. Whether it’s power connections, vacuum lines or compressed air, we make sure everything is accurately incorporated into the cleanroom planning. This helps prevent lost time and unexpected obstacles later in the process.
Prevent delays with proactive cleanroom planning
Utility upgrades can sometimes cause significant delays, especially for extensions of power capacity or compressed air lines. In some regions, these adjustments can take more than three months. At Highcare, we take this risk early in the process by proactively facilitating contact with utility companies. This way, we prevent your project from grinding to a halt.
And thanks to our modular construction system, we can accommodate a flexible planning set up, whereby during building of the cleanroom easily make adjustments without delay. Our technology allows us to manufacture parts in advance and quickly install them on site. As a result, we keep the total construction of a cleanroom as short as possible, even if utilities take a little longer.
Cleanroom fast and flexible build – Ready for immediate use
Highcare uses IFD construction technology that allows us to flexibly cleanrooms build and to the highest standard. This modular box-in-box system allows us to build the cleanrooms deliver quickly, and flexibly build. Major modifications can be made easily thanks to easy disassembly and prefabrication.
On top of that, we deliver each cleanroom completely ready to use, including an ISO 14644 certificate, which guarantees that it meets the strictest international standards for air quality and hygiene.
Saving costs at cleanroom construction with IFD technology
With our IFD technology, you can not only quickly create a cleanroom buildbut also save significantly on costs. Our cleanrooms are modular and demountable, which means they are easy to modify or expand without incurring high costs.
The airtight walls and ceilings ensure that pipes and return air remain invisible, yet easily accessible for maintenance. We incorporate all pipes neatly into hollow walls, keeping them hidden and maintaining the cleanroom’s hygienic appearance.
In addition, we use energy-efficient LED lighting that lasts as long as 50,000 hours, which not only makes maintenance easy, but also keeps operating costs low. This makes our cleanrooms not only efficient during construction, but also advantageous in long-term operation.
Cleanroom build for the future
Our cleanrooms are designed with the future in mind. The demountable walls and ceilings allow for easy modifications even years after completion. This means you can expand or modify the cleanroom without high costs. And should anything be damaged, panels can be replaced quickly and inexpensively, contributing to the long life of the room.
Flexible, modular and ready to use
The cleanroom constructionprocess at Highcare is designed to be fast, efficient and without delays. Through proactive cleanroom planning and close collaboration with your team, we ensure that all technical requirements – from power and air technology to other utilities – are carefully coordinated. This prevents delays and ensures a flawless construction process, even at complex sites.
Our modular IFD system allows your cleanroom flexible and ready to use build. Thanks to industrial prefabrication, components can be produced in advance and installed quickly on site, making the cleanroom constructiontime remains short and costs are saved. Each cleanroom is also delivered ready to use and meets strict ISO standards, ensuring an internationally recognized, safe and hygienic working environment.
The install of a Highcare cleanroom takes between three and six months, depending on your specific needs and technical requirements. Thanks to our proactive planning and modular construction technology, you can count on an efficient and reliable process, even in complex locations.